| Location | Thailand |
| Capacity | 600,000 tonnes/year |
| Product mix | Ø12–32 mm rebar (SD40T / SD50T) |
| Scope | Rolling line, cut-to-length, cooling bed handling and operator training |
| Commissioned | 2019 |
| Status | In operation |
The client entered the business as a scrap-based melting operation, selling induction-furnace billets to smaller rolling shops in the region. By the mid-2010s local construction demand was shifting decisively toward certified rebar, and buyers were asking for TIS 24 material rather than plain billet. Selling semi-finished product meant accepting thin margins and volatile orders, while the finishing step — where most of the value sat — stayed in someone else's hands.
They decided to move downstream, but three constraints shaped the brief. First, the plant had to produce SD40T and SD50T grades to Thai standard within normal campaign planning; metallurgy and controlled cooling were new territory for their team. Second, floor space was fixed — the new mill had to sit alongside the existing melt shop without triggering a major civil programme. Third, they had no in-house rolling experience, so the line had to arrive as one coordinated package with training rather than as a list of machines to be assembled by others.
Taifeng supplied a two-strand high-speed bar mill integrated with the existing induction melting and billet casting stage, designed for 600,000 t/y of Ø12–32 mm rebar. Scope covered the rolling line, cut-to-length, cooling bed handling and operator training; the two strands were commissioned in sequence so billet supply was never interrupted for long. After commissioning the plant moved from selling semi-finished product to delivering certified finished rebar to regional contractors.






Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.
Our sales engineers are available on WhatsApp during business hours (GMT+8)
| Location | Thailand |
| Capacity | 600,000 tonnes/year |
| Product mix | Ø12–32 mm rebar (SD40T / SD50T) |
| Scope | Rolling line, cut-to-length, cooling bed handling and operator training |
| Commissioned | 2019 |
| Status | In operation |
The client entered the business as a scrap-based melting operation, selling induction-furnace billets to smaller rolling shops in the region. By the mid-2010s local construction demand was shifting decisively toward certified rebar, and buyers were asking for TIS 24 material rather than plain billet. Selling semi-finished product meant accepting thin margins and volatile orders, while the finishing step — where most of the value sat — stayed in someone else's hands.
They decided to move downstream, but three constraints shaped the brief. First, the plant had to produce SD40T and SD50T grades to Thai standard within normal campaign planning; metallurgy and controlled cooling were new territory for their team. Second, floor space was fixed — the new mill had to sit alongside the existing melt shop without triggering a major civil programme. Third, they had no in-house rolling experience, so the line had to arrive as one coordinated package with training rather than as a list of machines to be assembled by others.
Taifeng supplied a two-strand high-speed bar mill integrated with the existing induction melting and billet casting stage, designed for 600,000 t/y of Ø12–32 mm rebar. Scope covered the rolling line, cut-to-length, cooling bed handling and operator training; the two strands were commissioned in sequence so billet supply was never interrupted for long. After commissioning the plant moved from selling semi-finished product to delivering certified finished rebar to regional contractors.






Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.