| Location | Guangdong |
| Capacity | 1,500,000 t/y |
| Product mix | Rebar (two-strand slitting) |
| Scope | Two-strand slitting rebar line built into the existing bay |
| Commissioned | 2016 |
| Status | In operation |
One of the earlier private rebar producers in the region had run its original bar mill for years, and the installed line no longer matched the tonnage the site was being asked to deliver. Equipment wear was showing in yield, dimensional spread and how often the line stopped, while local power tariffs left little room for running inefficient passes just to hold schedule.
A greenfield plant was not on the table, and a long shutdown was not acceptable either — the mill sold into construction supply chains that would simply re-source during downtime. The site already held the land, the cranes and the power connection, so the requirement was a replacement line built into the existing bay, installed within a short window, and carrying the site's output on two-strand slitting instead of the single-strand passes the old stands ran.
Taifeng supplied a two-strand slitting rebar line rated at 1,500,000 t/y, laid out inside the existing bay and around the site's utility capacity. The change lifted output per hour and stabilised section tolerances, while keeping the plant's power draw inside its existing allocation.






Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.
Our sales engineers are available on WhatsApp during business hours (GMT+8)
| Location | Guangdong |
| Capacity | 1,500,000 t/y |
| Product mix | Rebar (two-strand slitting) |
| Scope | Two-strand slitting rebar line built into the existing bay |
| Commissioned | 2016 |
| Status | In operation |
One of the earlier private rebar producers in the region had run its original bar mill for years, and the installed line no longer matched the tonnage the site was being asked to deliver. Equipment wear was showing in yield, dimensional spread and how often the line stopped, while local power tariffs left little room for running inefficient passes just to hold schedule.
A greenfield plant was not on the table, and a long shutdown was not acceptable either — the mill sold into construction supply chains that would simply re-source during downtime. The site already held the land, the cranes and the power connection, so the requirement was a replacement line built into the existing bay, installed within a short window, and carrying the site's output on two-strand slitting instead of the single-strand passes the old stands ran.
Taifeng supplied a two-strand slitting rebar line rated at 1,500,000 t/y, laid out inside the existing bay and around the site's utility capacity. The change lifted output per hour and stabilised section tolerances, while keeping the plant's power draw inside its existing allocation.