| Location | Guangdong |
| Capacity | 300,000 t/y (bar) within a 460,000 t/y crude-steel approval |
| Product mix | High-speed bar, wire rod coil and PC steel bar |
| Scope | Melting equipment (EAF, ladle refining, vacuum degassing) + casters + one bar line, two wire rod lines, twelve PC steel bar lines |
| Commissioned | 2020 |
| Status | In operation |
A specialised steel producer serving the piling and construction supply chain wanted to move upstream in value terms. Plain rebar margins were thin and the buyer base cyclical; prestressed concrete bar for pipe piles and coil rod for downstream drawing offered better returns from the same melting capacity.
The product map dictated plant design. Three finishing routes — high-speed bar, wire rod coil and PC steel bar — had to be fed from one melt shop, and PC bar quality depends on steel cleanliness, so vacuum degassing was requested as part of the melting route rather than treated as optional. Flexibility came before volume: the plant needed to switch between routes according to order mix, not run one product continuously.
Taifeng covered the melting equipment — electric arc furnaces, ladle refining and vacuum degassing, with matching continuous casters — together with one high-speed bar line, two high-speed wire rod lines and twelve PC steel bar lines, against an approved bar capacity of 300,000 t/y. The combination let the producer quote structural bar, drawn coil and prestressed product from a single order desk.






Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.
Our sales engineers are available on WhatsApp during business hours (GMT+8)
| Location | Guangdong |
| Capacity | 300,000 t/y (bar) within a 460,000 t/y crude-steel approval |
| Product mix | High-speed bar, wire rod coil and PC steel bar |
| Scope | Melting equipment (EAF, ladle refining, vacuum degassing) + casters + one bar line, two wire rod lines, twelve PC steel bar lines |
| Commissioned | 2020 |
| Status | In operation |
A specialised steel producer serving the piling and construction supply chain wanted to move upstream in value terms. Plain rebar margins were thin and the buyer base cyclical; prestressed concrete bar for pipe piles and coil rod for downstream drawing offered better returns from the same melting capacity.
The product map dictated plant design. Three finishing routes — high-speed bar, wire rod coil and PC steel bar — had to be fed from one melt shop, and PC bar quality depends on steel cleanliness, so vacuum degassing was requested as part of the melting route rather than treated as optional. Flexibility came before volume: the plant needed to switch between routes according to order mix, not run one product continuously.
Taifeng covered the melting equipment — electric arc furnaces, ladle refining and vacuum degassing, with matching continuous casters — together with one high-speed bar line, two high-speed wire rod lines and twelve PC steel bar lines, against an approved bar capacity of 300,000 t/y. The combination let the producer quote structural bar, drawn coil and prestressed product from a single order desk.






Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.
Get expert consultation and a custom quote for your production needs. Our team responds within 24 hours.