Guangdong Bar & Special Bar Mill | Taifeng

Guangdong – Bar & Special Bar Mill Project

350,000 – 400,000 t/y rebar within a 600,000 t/y crude-steel approval · Standard rebar + special bar qualities · commissioned 2019

Project at a Glance

LocationGuangdong
Capacity350,000 – 400,000 t/y rebar within a 600,000 t/y crude-steel approval
Product mixStandard rebar + special bar qualities
ScopeTwo bar rolling lines set up for rebar-to-special-bar changeover
Commissioned2019
StatusIn operation

Background & Requirements

An older steel producer in the north of the province completed a capacity replacement programme and returned to operation on a modernised basis. The previous plant built its reputation on construction rebar; staying with that single product would leave it exposed to the same price cycle that had caused trouble before.

Their definition of the new lines was deliberately broad. Both were specified to run standard rebar when construction demand was strong and to change over to special bar qualities when it was not — requiring roll shop capability, cooling control and layout planning prepared for two quite different products on the same stands. The rebuilt plant also had to satisfy the energy and emissions requirements attaching to the replacement permit.

Taifeng supplied equipment for two bar rolling lines set up for rebar-to-special-bar changeover, within a crude steel approval of 600,000 t/y and a practical rebar schedule of 350,000–400,000 t/y. The plant could follow either market without waiting for new equipment.

Project Gallery

Guangdong bar and special bar mill — plant view
Blue and red mill equipment inside the Guangdong bar and special bar mill workshop
Blue machine with a red safety fence at the Guangdong bar and special bar mill
Blue machines and red stairways at the Guangdong bar and special bar mill
Guangdong bar and special bar mill — equipment detail
Stacked steel bars in the storage shed at the Guangdong bar and special bar mill

Get Your Custom Quote

📍 Address:Xianmei Science and Technology Park, Rongcheng District, Jieyang City, Guangdong, China
📞 Phone/WhatsApp:+86 158 1350 2570
📧 Email:mxianglife@gmail.com
🕐 Working Hours:Monday – Saturday, 8:30 AM – 6:00 PM (GMT+8)

Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.

  • Process calculation & mill selection within 48 hours
  • Turnkey scope: design → fabrication → installation → commissioning
  • Critical spare parts shipped within 72 hours
  • 12-month warranty + lifetime technical support
  • 40 years in rolling equipment, exported to 45+ countries

📝 Request a Quote

Prefer to Talk Directly?

Our sales engineers are available on WhatsApp during business hours (GMT+8)

Guangdong – Bar & Special Bar Mill Project

350,000 – 400,000 t/y rebar within a 600,000 t/y crude-steel approval · Standard rebar + special bar qualities · commissioned 2019

Project at a Glance

LocationGuangdong
Capacity350,000 – 400,000 t/y rebar within a 600,000 t/y crude-steel approval
Product mixStandard rebar + special bar qualities
ScopeTwo bar rolling lines set up for rebar-to-special-bar changeover
Commissioned2019
StatusIn operation

Background & Requirements

An older steel producer in the north of the province completed a capacity replacement programme and returned to operation on a modernised basis. The previous plant built its reputation on construction rebar; staying with that single product would leave it exposed to the same price cycle that had caused trouble before.

Their definition of the new lines was deliberately broad. Both were specified to run standard rebar when construction demand was strong and to change over to special bar qualities when it was not — requiring roll shop capability, cooling control and layout planning prepared for two quite different products on the same stands. The rebuilt plant also had to satisfy the energy and emissions requirements attaching to the replacement permit.

Taifeng supplied equipment for two bar rolling lines set up for rebar-to-special-bar changeover, within a crude steel approval of 600,000 t/y and a practical rebar schedule of 350,000–400,000 t/y. The plant could follow either market without waiting for new equipment.

Project Gallery

Guangdong bar and special bar mill — plant view
Blue and red mill equipment inside the Guangdong bar and special bar mill workshop
Blue machine with a red safety fence at the Guangdong bar and special bar mill
Blue machines and red stairways at the Guangdong bar and special bar mill
Guangdong bar and special bar mill — equipment detail
Stacked steel bars in the storage shed at the Guangdong bar and special bar mill

Get Your Custom Quote

📍Address:Xianmei Science and Technology Park, Rongcheng District, Jieyang City, Guangdong, China
📞Phone/WhatsApp:+86 158 1350 2570
📧Email:mxianglife@gmail.com
🕐Working Hours:Monday – Saturday, 8:30 AM – 6:00 PM (GMT+8)

Tell us your requirements and our engineers will recommend the right model and configuration. We reply within 24 hours.

  • Process calculation & mill selection within 48 hours
  • Turnkey scope: design → fabrication → installation → commissioning
  • Critical spare parts shipped within 72 hours
  • 12-month warranty + lifetime technical support
  • 40 years in rolling equipment, exported to 45+ countries

📝 Request a Quote

Prefer to Talk Directly?

Get expert consultation and a custom quote for your production needs. Our team responds within 24 hours.